Case study · Commercial

Cooling a secondary school assembly hall

Three 7.1 kW Samsung systems for a secondary school assembly hall near Frodsham, fitted through 600 mm of solid brick, one unit a day over three days.

Three Samsung wall-mounted air conditioning units installed high on the wall of the main assembly hall at a secondary school near FrodshamMain assembly hall · three indoor units
ClientSecondary school near Frodsham
SpaceMain assembly hall
Equipment3 × Samsung 7.1 kW wall-mounted systems
Total cooling capacity21.3 kW
Outdoor unitsFloor-mounted in an adjacent courtyard
Time on site3 days

The space

A school's main assembly hall is one of the harder rooms in the building to keep comfortable. It's a large, high-ceilinged space with tall windows, and when it's full the room gains heat quickly.

The answer was three separate 7.1 kW Samsung wall-mounted systems, spaced along the long wall between the windows. Three independent systems spread the output evenly across the room and give 21.3 kW of cooling in total. As heat pumps, they heat the hall too.

The challenge: 600 mm of solid brick

Each system needs a route through the wall for its refrigerant pipework, cabling and condensate. In a modern building that's a routine core through a cavity wall. Here the hall walls are 600 mm of solid brick, roughly six bricks deep, so every route had to be core drilled through the full thickness.

Coring through that much solid masonry is slow, heavy work, and the core has to come out cleanly in the right place on both faces of the wall, with pipework and trunking lined up on either side. It's what set the pace of the whole job.

The approach: one unit a day

The installation ran at one complete system per day. Each day covered the core, the indoor unit, the pipe run, the outdoor unit and the connections for that system. The job took three days in total.

The outdoor units are floor-mounted in a courtyard next to the hall. Students don't use that courtyard, which made it an ideal spot: the units sit on the ground rather than being hung high on the old brickwork, they're out of the way of pupils, and they sit close to the hall they serve.

All three systems were commissioned by Cheshire Climate Solutions Ltd, a Refcom F-Gas certified company (certificate REF1023295).

Three Samsung outdoor condenser units floor-mounted in the courtyard beside the school's main hall
The three outdoor units, floor-mounted in the courtyard beside the hall.

Planning air conditioning for a school or older building?

Solid walls, listed features, restricted access and occupied buildings all change how an installation has to be planned. We survey properly first so the timescale and price reflect the building you actually have. See our commercial air conditioning page, or get in touch about your project.